S.NO | Project Name | Location | AEIPL Work | Status | High lights |
---|---|---|---|---|---|
1 | Chinki-Baras Barrage Combined | Udaipura | Total Length of Pipeline:42004 Metric Ton | Ongoing | 28 Pipes of Per Day (OD 2628) |
Copyright 2023 © Amma Engineering & Infrastructure Pvt Ltd. All Right Reserved.