S.NO Project Name Location AEIPL Work Status High lights Responsibilities
1 Gajwel Extension Kuknoorpalli, Gajwel Total Length of Pipeline:55KM Ongoing Manually coated 18 pipes per day(OD 2228) External Coating (Guniting)
2 Mallanna Sagar Link - IV Yellaipalli, Siddipet, Telangana Execavation Work Onging -- Execavation of 4.6x4.4Mtrs(height and width) 750 Mtr/month
3 Mallanna Sagar Link - IV Yellaipalli, Siddipet, Telangana Pipeline Ongoing -- 250 Pipes per Month Internal and External Painting.(OD 3434 mm)
4 Mallanna Sagar Link - IV Yellaipalli, Siddipet, Telangana Pipeline Ongoing -- Laying of M.S Pipes 3.2 dia
5 Futuro Infra LLP (LIS Chikkanayakahalli) Malleshwaram, Bangalore, Karnataka Pipeline Ongoing -- ID Painting and OD Brush Coating (Guniting)
6 Mallanna Sagar Link - II Karimnagar, Telangana Pipeline Ongoing -- ID Painting and OD Brush Coating (Guniting)
7 PAVAGADA Drinking water supply Challakere, Banavikal, pavagada Total Length of Pipeline: 160KM Completed produced 1350 Pipes, 25 per day with brush coating External Coating ( Brush Coating)
Internal Painting
8 Mahaboob Nagar drinking water supply Bisinipalle, Nagar kurnool Total Length of Pipeline:60KM Completed in 2017 Manually coated 15 pipes per day Manual Rolling of OD 1824 mm
External Coating (Guniting)
Internal Painting
9 Uddhanam Hiramandalam, Srikakulam Total Length of Pipeline:25 KM Completed in 2022 Brush coating 26 Pipes/day Internal Coating (Cement motor lining)
External Coating (Brush coating)
10 Tharikeri Drip Irrigation Ajjampur Total Length of Pipeline: 20KM Completed in 2020 Manual Coating 40pipes/day External Coating ( Guniting)
Internal Painting
MS Pipe laying
11 Kollar lift Irrigation Project Banglore Total Length of Pipeline: 40KM Completed in 2018 Manually coated 20 pipes per day External Coating ( Guniting)
Pipeline Laying and welding
12 MallanaSagar NAK-14 Thogunta Total Length of Pipeline: 15KM Completed in 2019 Manually coated 18 pipes per day Manual Rolling of OD 2328 mm
External Coating (Guniting)
Internal Painting
13 YSR Palnadu Sathanapalle Total Length of Pipeline: 18KM Completed in 2021 Manually Coating 18Pipes /day External Coating ( Guniting)
Internal Painting
14 Dudda LIS Mandya Total Length of Pipeline:22 KM Completed in 2021 Brush Coating 37 pipes /Day External Coating ( Brush coating)
Internal Painting
Pipeline Laying and welding
15 Arsikere LIS Arsikerehandpost Total Length of Pipeline: 37 KM Completed in 2018 Manual Coating 33 pipes /Day External Coating ( Guniting)
Internal Painting
Pipeline Laying and welding
16 Altharpadu LIS Dakkali Total Length of Pipeline:5KM Completed in 2021 Manual coating 18 Pipes per day External Coating ( Guniting)
Internal Painting
17 AKBR Mallepalli Total Length of Pipeline:20KM Completed in 2017 Manual coating 28 Pipes per day External Coating ( Guniting)
Pipe Laying
18 Sitaram Paalavancha Total Length of canal :6KM Completed in 2020 Canal Guniting of ( 80 mm thick ness ) 270 SqMts per day Canal Guniting